Statement of World Bank Group on Discontinuing Doing Business Report Read our statement

This topic tracks the procedures, time and cost to build a warehouseincluding obtaining the necessary licenses and permits, submitting all required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the dealing with construction permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The most recent round of data collection was completed in May 2020. See the methodology for more information. Video presentation of the methodology is also available.

= Subnational Doing Business data available. Multi City = Multi-city data for same economy is available.